For all new generator permit applications, The City of Fernandina Beach will require the following items:
July 6, 2020
Bulletin B-02-2020
To: All Contractors
From: Stephen Beckman, CBO, CFM
Subject: New Generators
For all new generator permit applications, The City of Fernandina Beach will require the following items:
1. A site plan showing location of generator equipment in relation to property line (setback), operable windows, and location and size of gas tank (if applicable).
2. A riser diagram along with load calculations. Riser diagram should show existing service details as well as new details.
3. Generator, transfer and load management equipment spec sheets along with installation instructions.
- At completion of project, if the equipment is placed at or close to property setback, a site survey will be required to verify proper location.
- If the property is in a special flood hazard area, an elevation certificate will be required to show the new equipment meets required flood elevation.